Sort:
I-405/SR 522 Brickyard Contract 9727 2 issues

Dispute

2
I-405 Renton to Bellevue Contract 9840 Example 10 issues

Notice

2
N002Stormwater Pond Relocation
$450K
N005Noise Wall Foundation
$120K

Protest

2
P008Retaining Wall Redesign
$1.75M
P009Signal Conduit Relocation
$340K

Determination

2
P005Utility Conflict — Gas Main
$2.3M
P007Median Barrier Redesign
$870K

Dispute

2
P002Temporary Shoring Scope
$4.1M
P003Drainage Outfall Redesign
$680K

Hearing

1
P001Differing Site Conditions
$6.2M

Closed

1
P004Temporary Erosion Control
$95K
SR 520 Portage Bay Bridge Contract 9215 Example 8 issues

Notice

1
N012Marine Habitat Mitigation
$280K

Protest

1
P010Barge Access Restriction
$3.4M

Determination

1
P011Pontoon Ballast Redesign
$1.5M

Dispute

2
P006Concrete Mix Specification
$920K
P008Column Pier Foundation
$5.7M

Hearing

2
P001Seismic Retrofit Scope
$8.9M
P003Post-Tension Anchor Delay
$2.1M

Closed

1
P002Temporary Navigation Channel
$175K