Sort:
Number
Amount
Deadline
Columns
Value:
All
> $100K
> $500K
> $1M
> $5M
Board
List
I-405/SR 522 Brickyard
Contract 9727
6 issues
Protest
1
P021
Streambed Material Gradation
$530K
WSDOT
Jul 30
Dispute
5
WSDOT
P001
Vault NW12
$2.1M
WSDOT
Mar 20
Awaiting DRB Referral
P006
DSC 006
$25.4M
TBD
P014
Bridge 405/103E Widening (ATC-1)
$1.4M
TBD
P019
Juanita Creek Lateral Migration
$4.6M
TBD
P011
PSE Power Routing SR 522 Transit Hub
$1.11M
Skanska
ID
Title
Stage
Amount
BIC
Next Action
Deadline
P001
Vault NW12
Dispute
$2.1M
WSDOT
Response to LTR 367 updated cost summary ($2.1M). Interim acknowledgment drafted. Full response pending.
Mar 20
P006
DSC 006
Dispute
$25.4M
TBD
Human review and approve determination
—
P011
PSE Power Routing SR 522 Transit Hub
Dispute
$1,112,424
Skanska
Position Paper ready for team review; awaiting Skanska's written referral per GP 1-04.5(1).1.8
—
P014
Bridge 405/103E Widening (ATC-1)
Dispute
$1.4M
TBD
Awaiting DRB referral by either party under GP 1-04.5(1).1.8
—
P019
Juanita Creek Lateral Migration
Dispute
$4.6M
TBD
Awaiting DRB referral by either party under GP 1-04.5(1).1.8
—
P021
Streambed Material Gradation
Protest
$530K
WSDOT
Four per-crossing determinations (Skanska LTR 476-479) in preparation, due 7/30/26
Jul 30
I-405 Renton to Bellevue
Contract 9840
Example
10 issues
Notice
2
N002
Stormwater Pond Relocation
$450K
N005
Noise Wall Foundation
$120K
Protest
2
P008
Retaining Wall Redesign
$1.75M
P009
Signal Conduit Relocation
$340K
Determination
2
P005
Utility Conflict — Gas Main
$2.3M
P007
Median Barrier Redesign
$870K
Dispute
2
P002
Temporary Shoring Scope
$4.1M
P003
Drainage Outfall Redesign
$680K
Hearing
1
P001
Differing Site Conditions
$6.2M
Closed
1
P004
Temporary Erosion Control
$95K
SR 520 Portage Bay Bridge
Contract 9215
Example
8 issues
Notice
1
N012
Marine Habitat Mitigation
$280K
Protest
1
P010
Barge Access Restriction
$3.4M
Determination
1
P011
Pontoon Ballast Redesign
$1.5M
Dispute
2
P006
Concrete Mix Specification
$920K
P008
Column Pier Foundation
$5.7M
Hearing
2
P001
Seismic Retrofit Scope
$8.9M
P003
Post-Tension Anchor Delay
$2.1M
Closed
1
P002
Temporary Navigation Channel
$175K